Membrane structure landscape Maintenance scheme within warranty period!
Before rainy season and winter, special personnel (4-8 persons) shall be appointed to carry out routine inspection and maintenance of the project to ensure smooth membrane surface and drainage facilities.
In case of important events or activities, professional workers (8-16 persons) shall be designated 2 weeks in advance to carry out safety inspection and necessary cleaning to ensure the normal holding of events.
During and after severe weather such as strong wind, hail, rainstorm and heavy snow, four professional technicians are designated to carry out safety inspection on the project and eliminate potential safety hazards in time.
One year after the completion of the project, four professional technicians will be appointed to check whether the membrane structure is in normal working condition. The inspection contents include: whether the membrane surface is greatly deformed, whether the membrane surface is loose due to the loss of pretension, whether the membrane surface is partially torn, whether the membrane coating is peeled off, and whether the connectors are loose
In case of large deformation of membrane surface and relaxation of membrane surface due to loss of pretension, a secondary tensioning scheme shall be formulated and implemented in time.
In case of partial tear of film surface and peeling off of film coating, it shall be repaired in time.
In case of loose connectors, tighten or reinforce them in time.
During the warranty period, the designated personnel of the user unit shall be trained regularly to ensure the normal use of the user unit.
Membrane structure parking shed The materials have many advantages and benefits. Weifang Ruikai Membrane Structure Engineering Co., Ltd. introduced several characteristics of membrane materials, such as light weight, high strength, fire and flame resistance, good self-cleaning, free from ultraviolet radiation, fatigue resistance, distortion resistance, aging resistance, and long service life. It has high light transmittance and little heat absorption. It is precisely because of this cross era invention of membrane materials that membrane structure buildings become modern buildings.
According to the overall planning, functions and economic budget of the architectural design, select the cost-effective membrane structure:
Double membrane scheme. The membrane structure mainly focuses on building durability and structure.
Double membrane plus sound insulation layer scheme. Membrane structure shall pay attention to the compatibility of sound insulation materials and thermal insulation materials, as well as the coordination with light transmittance.
Single layer membrane scheme of membrane structure parking shed.