Construction scheme of membrane structure canopy in winter
1、 Preparation before construction:
Determine the construction time: select a day with good weather to avoid rainy and snowy weather.
Prepare materials and tools: membrane structure canopy materials, support frames, screws, nuts, bolts and other tools.
Safety measures: Prepare safety helmet, gloves, safety rope and other personal protective equipment.
2、 Construction steps:
Build the support frame: according to the design drawings, build the support frame to ensure that the structure is firm and stable.
Installation of membrane materials: lay the membrane materials on the support frame, and pay attention to keeping the membrane materials clean and neat.
Fix the membrane material: use screws, nuts, bolts and other tools to fix the membrane material on the support frame to ensure that the membrane material will not be blown away by the wind.
Check the construction quality: check the fixation of membrane materials to ensure that there is no looseness or falling off.
Clean the construction site: clean the construction site, remove sundries and garbage, and keep the construction site clean.
3、 Precautions:
Cold protection and warmth preservation: during winter construction, workers should pay attention to warmth preservation and wear thick work clothes and cold proof shoes to prevent colds or colds.
Windproof measures: set windproof fences at the construction site to reduce the impact of wind on construction.
Safe construction: pay attention to safety during construction, comply with relevant safety operation regulations, and ensure the personal safety of workers.
Construction quality: the construction shall be carried out in strict accordance with the design drawings and construction requirements to ensure that the construction quality meets the requirements.
4、 Post construction maintenance:
Regular inspection: Regularly inspect the fixation of membrane structure canopy, and timely find and deal with loose or falling parts.
Cleaning and maintenance: Regularly clean the membrane material to maintain its smoothness and transparency.
Snow prevention measures: in snowy days or after snow, timely clean the snow on the canopy to avoid pressure and damage to the canopy.
The above are the basic steps and precautions of the winter construction scheme of the membrane structure canopy, and I hope it will be helpful to you. In the construction process, it is necessary to operate in strict accordance with the relevant specifications and requirements to ensure the construction quality and the safety of workers.