Membrane structure landscape Protection plan during warranty period !
Before the arrival of dry season and winter, special personnel (4-8 persons) shall be designated to conduct routine inspection and protection of the project to ensure that the membrane surface and drainage equipment are unblocked.
In case of important events or activities, professional workers (8-16 people) shall be designated 2 weeks in advance to check and clean up as necessary to ensure the normal holding of events.
During and after severe weather processes such as strong wind, hail, rainstorm and heavy snow, four professional technicians are designated to check the project and eliminate hidden dangers in time.
One year after the completion of the project, four professional technicians will be appointed to check whether the membrane structure is in normal working condition, including: whether the membrane surface is greatly deformed, whether the membrane surface is loose due to the loss of pretension, whether the membrane surface is partially torn, whether the membrane coating is peeled, and whether the connectors are loose
In case of large deformation of the membrane surface and looseness of the membrane surface due to loss of pretension, a secondary tensioning plan shall be formulated and implemented in a timely manner.
If the film surface is partially torn or the film coating is peeled off, it shall be repaired in time.
In case of loose connections, tighten or reinforce them in time.
During the warranty period, the designated personnel of the application unit shall be trained regularly to ensure the normal operation of the application unit.
Membrane structure parking shed The materials have many advantages and benefits. Weifang Ruikai Membrane Structure Engineering Co., Ltd. introduced several characteristics of the membrane materials, such as light weight, high strength, fire resistance, good self-cleaning, free from ultraviolet radiation, fatigue resistance, distortion resistance, aging resistance, and long service life. It has high light transmittance and little heat absorption. It is precisely because of the invention of cross era membrane materials that the construction of membrane structures has become a modern construction.
According to the overall planning, function and economic budget of the construction design, select the membrane structure with cost performance ratio:
Double membrane plan. The membrane structure mainly focuses on construction durability and structure.
Double membrane plus sound insulation layer plan. The membrane structure shall pay attention to the compatibility of sound insulation data and thermal insulation data, as well as the harmony with light transmittance.
Single layer membrane plan for membrane structure parking shed.