上海后花园论坛

Welcome to Liaoning Xumei Building Decoration Engineering Co., Ltd!

 Membrane structure landscape Hotline:
thirteen billion three hundred and forty-two million four hundred and forty-five thousand two hundred and ninety-nine
 Steel structure glass canopy

Company News

contact us

Liaoning Xumei Building Decoration Engineering Co., Ltd

contact number: thirteen billion three hundred and forty-two million four hundred and forty-five thousand two hundred and ninety-nine  

Contact: Manager Luo

Address: Room 247-11704, Floor 2, No. 109-1, Quanyun Road, Shenyang Area, China (Liaoning) Pilot Free Trade Zone

Website: www.lnxuei.com

          www.xmjz.top


Analysis of installation technology of membrane structure shed

Your current location: home page >> News Center >> Company News

Analysis of installation technology of membrane structure shed

Date of issue: 2020-06-10 Author: Click:

Membrane structure shed It is a new form of building structure. It uses good architectural fabric, i.e. membrane, as the material, and forms a structural system together with supporting members or cables. It uses flexible cables or rigid supporting structures to tension the membrane surface to form an interactive curved surface, thus forming a structural system with certain stiffness and tension, which can cover large span space and has high technical content. The following membrane shed manufacturers will explain the relevant installation and benefits to you:

 

 membrane structure

 Membrane structure sunshade

Membrane structure shed installation technology

  1. The membrane structure shed includes three parts: membrane expansion, connection and fixation, and stretch forming.

  2. During installation, a climbing safety net shall be installed on the membrane surface, and the operators must fasten their safety belts. During installation, operators shall wear soft shoes when walking on the membrane surface, and shall not wear hard objects such as keys.

  3. The installation of membrane structure shed shall be carried out under the condition that the wind force does not exceed four levels. During installation, pay full attention to the wind speed and direction to avoid vibration. At the same time, the suspension and continuation of the project shall be determined according to the size of rainfall.

  4. Rainwater accumulation shall not occur during the installation of membrane structure shed. At the same time, the suspension and continuation of the project shall be determined according to the size of rainfall.

  5.  During tensioning, the sequence and amplitude of batch tensioning shall be determined, the tensioning speed shall be controlled, and the tensioning amplitude shall be determined according to the material characteristics.

The content of this article comes from the network. If you have any questions, please contact me to delete it!

 


Website: //i56i.cn/news/556.html

key word: membrane structure , Membrane structure shed

Recent browsing:

  • Online Service
  • contact number
    thirteen billion three hundred and forty-two million four hundred and forty-five thousand two hundred and ninety-nine
  • Online Message
  • WeChat
  • Online consultation
    Welcome to leave us a message
    Please enter your message here, and we will contact you as soon as possible.
    full name
    contacts
    Telephone
    Landline/mobile number
    mailbox
    mailbox
    address
    address