The maintenance and repair manual of membrane structure shall be provided by the Contractor together with material suppliers, production and installation units and design units, and the maintenance and repair work shall be entrusted to professional teams of professional companies;
The maintenance and repair of membrane structure shall be carried out in accordance with the maintenance manual of single project provided by the contractor, and the contractor shall explain and guide the requirements to the owner or management party;
The maintenance management responsible party shall keep the maintenance plan, maintenance records, maintenance reports, and modification records;
All fasteners used in the project, such as bolts, riggings, anchorages and other connectors, shall not be rotated at will. When the project is completed for 6 months, its use status shall be checked. If there is any looseness, it shall be tightened and reinforced;
The cleaning of the wound film structure shall be carried out in accordance with the provisions of the Articles of Association;
Professional management personnel should check and clean the roof before the rainy season and winter every year to prevent the loosening of waterproof nodes, blocking of water outlets, gutters and cornices, and keep the roof drainage system unblocked;
Timely replace the membrane materials according to the effective service life;
The maintenance and repair manual of membrane structure shall be provided by the Contractor together with the data supplier, manufacturing unit and planning unit, and the maintenance and repair work shall be entrusted to the professional team of professional companies;
The maintenance and repair of membrane structure shall be carried out in accordance with the repair and maintenance manual of single project provided by the Contractor, and the Contractor shall explain and coach the Owner or the handling party on its request;
It is necessary for the party responsible for repair and maintenance to keep the repair and maintenance plan, repair records, repair reports, and modification records;
All fasteners used in the project, such as bolts, slings, anchorages and other connectors, shall not roll at will. When the project is completed for 6 months, its application status shall be checked. If there is any looseness, it shall be tightened and reinforced;
The membrane structure shall be cleaned according to the rules in the regulations;