上海后花园论坛

Welcome to Liaoning Xumei Building Decoration Engineering Co., Ltd!

 Membrane structure landscape Hotline:
thirteen billion three hundred and forty-two million four hundred and forty-five thousand two hundred and ninety-nine
 Steel structure glass canopy

Membrane structure parking shed

contact us

Liaoning Xumei Building Decoration Engineering Co., Ltd

contact number: thirteen billion three hundred and forty-two million four hundred and forty-five thousand two hundred and ninety-nine  

Contact: Manager Luo

Address: Room 247-11704, Floor 2, No. 109-1, Quanyun Road, Shenyang Area, China (Liaoning) Pilot Free Trade Zone

Website: www.lnxuei.com

          www.xmjz.top


Wuhai membrane structure parking shed

Wuhai membrane structure parking shed

  • Detailed introduction

 Membrane structure parking shed


Detailed introduction:

On Membrane structure parking shed During the construction, there are many things we need to pay attention to, or we will cause irreparable losses if we are not careful.

First, before the construction of the membrane structure shed of Shenyang villa, all the materials needed to be used should be prepared and placed well to avoid putting them in damp and dirty places, especially the membrane materials, which should be packed with special packaging materials, and then unpacked when they are used.

Second, in the process of construction, construction signs should be set up nearby, especially in some dangerous sections, which should also be protected by guardrails. At the same time, it should also ensure the smoothness of the construction site and nearby roads.

Third, all buildings need to work at heights, and special attention should be paid to the safety of constructors at this time. The ladder they want to climb must be carefully checked and fixed in advance. The included angle between the ladder and the ground shall not exceed 70 degrees.

Fourth, because the membrane structure parking shed involves welding work, it is necessary to pay attention to safety in the process of work. When disassembling the parts connected with the power grid, you must remember to cut off the power first. If you are welding in public areas, you should also use a light shielding screen.


Website: //i56i.cn/product/634.html

key word:

Recent browsing:

Related products:

Related news:

  • Online Service
  • contact number
    thirteen billion three hundred and forty-two million four hundred and forty-five thousand two hundred and ninety-nine
  • Online Message
  • WeChat
  • Online consultation
    Welcome to leave us a message
    Please enter your message here, and we will contact you as soon as possible.
    full name
    contacts
    Telephone
    Landline/mobile number
    mailbox
    mailbox
    address
    address